System ABM-30 System training – Used for mapping 29-35mm (1.1″-1.4″) ID ducts Start Operational Training
System ABM-40 / DR-2 System training – For mapping 40-75mm (1.5″-3″) ID ducts Start Operational Training
System ABM-90 / DR-4 System training – Used for mapping 90mm+ (3.5″+) ID pipes Start Operational Training
System Centralizing wheelset training – Used for mapping 90-1000mm (3.5″-40″) ID pipes Start Operational Training
System Invert wheelset training – Used for mapping 150-1000mm (6″-40″) ID pipes Start Operational Training
System DRW-312m winch training – Manual winch used for 300meter (1000′) long segments Start Operational Training
System DRW-560s winch training – Electric winch used for 1500m (5000′) long segments Start Operational Training